Change your country/region

It looks like you entered an employee email address, but this is the customer sign-in. Use the link below instead.

  • After applying a self-leveling underlayment, when can I put down the final floor covering?

    Durock™ UltraCap™ — 2-3 days, depending on climate and environment

    Durock™ Speed™ — Non-moisture sensitive tile in 4 hours, other floor coverings in 16 hours

    Durock™ EcoCap™ — Non-moisture sensitive tile in 4 hours, other floor coverings in 16 hours

    Durock™ Fast Finish — Depending on thickness, floor covering can be put down in as little as 15 minutes after set